登录
首页 » matlab » filter

filter

于 2010-05-01 发布 文件大小:2KB
0 154
下载积分: 1 下载次数: 1

代码说明:

说明:  matlab中位值滤波,可以对连续信号进行中位值滤波(matlab median filter, the signal can be continuous median filter)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Spectral_Methods_In_Matlab
    matlab中的特殊数学算法,英文版书籍,比较专业。(The special mathematical algorithm matlab )
    2010-07-05 22:40:20下载
    积分:1
  • matlab-book
    matlab宝典,帮助您更好更深入的学习好matlab编程(matlab Collection to help you better and more in-depth study and matlab programming)
    2011-05-13 21:29:10下载
    积分:1
  • Svvehicle8i
    汽车8自由度simulink模型,可乙乙进行各种汽车动力学控制及其仿真研究工作 (Automotive 8 degrees of freedom simulink model, B B a variety of vehicle dynamics control and simulation study of)
    2012-07-16 17:29:20下载
    积分:1
  • Face-Capture
    这是一个用matlab编写的人脸搜索程序里面包含一个小的人脸图片数据集。(This is contains a small face images datasets were prepared using matlab face a search program inside.)
    2014-10-26 14:05:54下载
    积分:1
  • MaximumPowe
    max extractio power of wind power system connected to grid simulation in matlab
    2014-02-05 14:22:30下载
    积分:1
  • PCA_TE_Fault
    详尽的PCA算法对TE过程的故障诊断分析,内含有部分故障数据,可供调试使用,对做故障诊断的非常有帮助。(PCA algorithm of detailed analysis of the fault diagnosis process of TE, contains some failure data, available to debug, is helpful for fault diagnosis.)
    2021-04-06 00:19:03下载
    积分:1
  • MATLAB-Code-of-Radar
    关于雷达系统各方面的matlab仿真源代码,这是我自己整理,调试完成的。(The radar system matlab simulation source code, which is my own finishing, commissioning completed.)
    2013-03-15 16:22:56下载
    积分:1
  • peakfit
    A peak fitting program for time-series signals
    2015-01-01 19:47:41下载
    积分:1
  • FIBER-DIFF-BETWEN-dB-and-dBm-
    fiber optics communication
    2012-01-09 04:12:37下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • 696518资源总数
  • 105540会员总数
  • 37今日下载