-
Interpolacja
Interpolacja medianowa Lagrangea
- 2010-07-28 04:50:49下载
- 积分:1
-
dds
matlab下实现的DDS发生器,可观察其发生信号的波形,频谱。
运行前请先输入
global theta
theta=0 (matlab implementation of the DDS generator, may happen to observe the signal waveform, spectrum. Please enter a pre-operational global theta theta = 0 )
- 2009-03-05 09:53:11下载
- 积分:1
-
matlabdeguibiyesheji
matlab的GUI毕业设计有关自动控制原理时域分析(graduation Matlab GUI design principle of automatic control time-domain analysis)
- 2007-05-10 21:34:53下载
- 积分:1
-
FH_2FSK
基于FSK的快速跳频通信系统,使用simulink仿真工具实现(Fast frequency hopping communication system based on FSK)
- 2015-11-19 19:45:32下载
- 积分:1
-
RANSAC
SANSAC算法实现椭圆拟合,获取三轴磁力计的数据,对其进行椭圆拟合,用于磁力计数据矫正(SANSAC ellipse fitting algorithm to obtain three-axis magnetometer data, its ellipse fitting for magnetometer data correction)
- 2016-10-11 21:31:07下载
- 积分:1
-
dizhengbo
用c语言进行地震波模拟,地震波被看做弹性波,在不均匀介质中传播的信息。(Seismic wave simulation using c language, seismic waves are seen as an elastic wave propagation in inhomogeneous information medium.)
- 2014-02-11 17:14:06下载
- 积分:1
-
E-book
E-book for WiMAX_Technology
- 2010-11-08 23:31:00下载
- 积分:1
-
K-Means-Color-Reduction
说明: 基于K-MEANS的图像退色算法。平台为MATLAB6.5及以上。(Based on the K-MEANS algorithm image fade)
- 2009-08-18 14:32:40下载
- 积分:1
-
Turbocode
包括turbo码编译码程序,译码算法包括sova及max-log-map算法,并有完整链路验证其性能。(including turbo coding- decoding procedures, SOVA including decoding algorithm and max-log-map algorithm, and link integrity test its performance.)
- 2006-06-09 16:14:31下载
- 积分:1
-
psb2machines_pss
一1000 MW水电站(机组M1)通过一条500 kV, 700 km的输电线路与负载中心连接。负载中心模型是5000 MW的阻抗负载,由遥远的1000 MW电站和当地的5000 MW (机组 M2)电站供电。系统已经初始化,因此线路传送950 MW,接近它的潮流阻抗负载(SIL = 977 MW)。这两台机相当于一台水轮机和管理(HTG),励磁系统和电力系统稳定器(PSS)。这三个模块位于“涡轮和调速”子系统中。通过此例,在500 kV系统中制造故障,观察PSS对系统稳定性的影响。(a 1,000 MW hydropower station (crew M1) through a 500 kV, 700 km of transmission line and load center. Load center model is 5,000 MW of load impedance. from the distant 1000 MW power station and the local 5,000 MW (Unit M2) power supply. Is initialized, it transmits 950 MW. closer to its trend of load impedance (SIL = 977 MW). This machine is equivalent to a two hydraulic turbines and Management (HTG), excitation system and the power system stabilizer (PSS). This module is located at 3 "and turbine speed" subsystem. Through this cases, the 500 kV system manufacturing fault, PSS observation of the system stability.)
- 2020-09-09 09:58:04下载
- 积分:1