登录
首页 » matlab » GameMont1

GameMont1

于 2013-01-09 发布 文件大小:1KB
0 221
下载积分: 1 下载次数: 7

代码说明:

  蒙特卡洛方法 有趣的蒙提霍尔问题 求选中汽车的概率的模拟值向量(Monte Carlo method interesting Monty Hall problem seeking the analog value of the probability of the selected car vector)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • scat3d
    Makes 3d scatter plot much faster than scatter3
    2010-10-11 06:56:50下载
    积分:1
  • nhungvanban
    watermarking, embedd text into image, using matlab
    2014-11-28 12:51:22下载
    积分:1
  • pca_2d
    MATLAB自已编的二维DLA,基于ORL人脸数据库,效果不错。(MATLAB own series of two-dimensional DLA, based on the ORL face database, good results.)
    2008-06-19 09:41:08下载
    积分:1
  • MATLAB_SIMULINK
    MATLAB_SIMULINK MATLAB_SIMULINK 编程方法,优秀的入门资料。(MATLAB_SIMULINK MATLAB_SIMULINK programming methods, excellent introductory information.)
    2013-07-25 12:58:57下载
    积分:1
  • chap11
    徑向基底函數類神經網路,是單隱藏層的3層前向網路,模擬人腦中局部調整,有很好的逼近能力(Radial basis function neural network, a single hidden layer of 3 layer to the network, simulating the brain partial adjust, has a very good approximation ability)
    2007-10-29 18:25:26下载
    积分:1
  • fmid
    说明:  模糊建模工具箱,使用模糊聚类方法对系统进行辨识(Fuzzy modeling toolbox)
    2021-03-01 16:09:34下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • feedback
    说明:  判决反馈均衡器实现判决,很好的东西(Decision feedback equalizer to achieve decision, good things)
    2008-10-19 11:53:27下载
    积分:1
  • extract-grid-corner-methods-
    三种角点提取方法的matlab程序,用于摄像机标定。(three methods of corner extract based on matlab。)
    2012-04-15 14:56:54下载
    积分:1
  • fig2_MSOM
    The sourcecode of Universally-Convergent Squared-Operator Iteration Methods for fig2 using MSOM
    2013-12-03 20:52:29下载
    积分:1
  • 696516资源总数
  • 106425会员总数
  • 12今日下载