-
chapter05
antenna design chapter 5
- 2009-11-25 17:44:34下载
- 积分:1
-
production
生产信息与生产运营相关的热用户信息是各级决策者进行生产决策的两个关键因素。生产信息的及时、准确地获取和分析,能够及时掌握生产运营状况,在保证用户满意度的情况下,进行合理决策,来控制生产运营成本,提高公司整体效益信息处理是一个完整的概念。
(Production of information and manufacturing operations related to the heat user information is the decision-making at all levels of decision-makers to produce two key factors. Production information in a timely and accurate acquisition and analysis, and timely information on production and operation status, to ensure customer satisfaction in the circumstances, the rational decision-making, to control the production and operation costs and improve the overall efficiency of information processing company is a complete concept.)
- 2009-11-30 10:06:57下载
- 积分:1
-
zimufenlei
字母识别的一种应用并配有简单的分类器及基于BP网络的英文字母识别系统(Letters of application and identify with simple classifier based on BP neural network, and the English alphabet recognition system)
- 2010-06-09 17:16:23下载
- 积分:1
-
heading_control
This script will setup the nonlinear simulation (UAV_NL.mdl) and call
trim and linearization routines. Select the desired aircraft here in this
script, via the "UAV_config()" function call.
- 2013-07-20 15:59:41下载
- 积分:1
-
Newton-method
利用newton法,newton-honor法和Stevensen-newton法,解非线性方程的matlab原程序。(Using newton method, newton-honor method and Stevensen-newton method for solving nonlinear equations matlab original program.)
- 2011-01-28 11:14:18下载
- 积分:1
-
FILTROS-DIGITAIS
Digitals filters. Passby filters, lowpass and highpass filters.
- 2013-11-03 08:00:31下载
- 积分:1
-
dereverberation
Dereverberation code in matlab
- 2014-12-24 21:55:47下载
- 积分:1
-
item_set_names
trinitycore item_set_names表汉化(trinitycore item_set_names Chinese)
- 2015-03-07 03:26:30下载
- 积分:1
-
shuikuidiaodupso
说明: 水电站中长期优化调度主要是在满足电力系统出力要求以及下游综合用水要求等的前提下,合理地安排水库各个月份的发电流量,使得调度期内的总发电量最大。即在给定预报入库流量过程线、下游综合用水流量过程线、调度期起始水位和终止水位等条件下,通过总水量的合理运用使调度期内水电站的总发电量最大。(Long-term optimal operation of hydropower stations mainly in the power system to meet the output requirements, and integrated water requirements downstream of the premise, reasonable arrangements for generating reservoir flow each month, making the scheduling period, the largest amount of total power generation. That is forecast in a given inflow hydrograph, downstream water discharge hydrograph synthesis, scheduling and termination of the initial water level and water level conditions, the total amount of water through the rational use of the scheduling period, the total generating capacity of the largest hydropower station.)
- 2011-03-07 09:40:57下载
- 积分:1
-
六轴机械臂的自适应模糊控制
六轴机械臂的自适应模糊控制,用于其轨迹的规划(Adaptive Fuzzy Control six-axis robot arm)
- 2017-04-08 19:41:08下载
- 积分:1