登录
首页 » matlab » tiaopin_noise

tiaopin_noise

于 2011-07-21 发布 文件大小:1KB
0 76
下载积分: 1 下载次数: 90

代码说明:

  噪声调频干扰的产生程序,参考文献为中电29所的信息时代的电子战(FMnoise generate)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • golay23
    golay code in mat lab programme
    2009-03-07 03:09:54下载
    积分:1
  • spline
    说明:  Matlab学习宝典 插值与拟合 Matlab学习宝典(Learning Matlab Interpolation and Fitting Matlab Baodian learning Baodian)
    2008-12-01 13:02:15下载
    积分:1
  • guihuawenti
    matlab经典算法的程序之规划问题,包含无约束规划,线性规划等程序(matlab program of classical planning algorithms, contains no constraint programming, linear programming and other procedures)
    2011-07-09 11:23:33下载
    积分:1
  • data-fangzhen
    数据归一化的仿真,利用matlab实现,很好的例子啊 课件描述加数据(The normalized simulation using matlab to achieve good example courseware description plus data)
    2012-05-27 22:34:28下载
    积分:1
  • Icic
    Article published in ICIC about traveling waves
    2012-01-31 21:10:09下载
    积分:1
  • getbin
    you can with this code get binary version of image
    2010-08-31 00:14:33下载
    积分:1
  • winsvm
    说明:  在支持向量机中用于交叉核对的matlab程序。精度较高(In support vector machines used to cross-check the matlab program. High precision)
    2008-09-07 19:49:59下载
    积分:1
  • Matlab
    Matlab中常用的几个函数,很有用的文档,希望大家能用得上(Matlab in several functions, useful documents, in the hope that we can useful)
    2013-03-25 00:42:04下载
    积分:1
  • matlabandinthecourseoftheapplicationofelectronicin
    matlab及在电子信息课程中的各种应用,该书的内容介绍非常详细(matlab and in the electronic information in the Course of a variety of applications, the contents of the book describes in great detail)
    2009-11-10 22:01:21下载
    积分:1
  • date-calculate
    计算这一年已经逝去的天数(包括当天)。在平年中,它的取值范围为1到365,在闰年中,它的取值范围1到366。编写一个MATLAB程序,输入年,月,日,输出为对应的该天是当年的第几天。 闰年是这样规定的 1).能被400整除的年为闰年 2)能被100整除但不能被400整除的年不为闰年 3).能被4整除但不能被100整除年为闰年 4).其余的年份不为闰年 (This year has calculated the number of days elapsed (including that day). In non-leap year, it ranges from 1 to 365 in a leap year, it s the range of 1 to 366. Write a MATLAB program, enter the year, month, day, corresponding to the output of the first year of the day is a few days. This leap is required 1) is divisible by 400 is a leap year 2) can be divisible by 100 but not divisible by 400 years is not a leap year 3) be divisible by 4 but not divisible by 100 is a leap year 4) the rest of the year is not leap year)
    2011-12-13 23:35:17下载
    积分:1
  • 696532资源总数
  • 103709会员总数
  • 38今日下载