-
LDPC_Codes
LDPC encoder and decoder design in MATLAB
- 2009-03-13 20:34:36下载
- 积分:1
-
old-video-player-subeditand-more
old videoplayers src :cinemaplayer,subedit,viplay+the scientist & engineer s guide to digital signal processing.pdf(full)
- 2014-09-18 20:16:44下载
- 积分:1
-
matlab-examples
matlab应用实例精讲里面的示例代码,非常有用(examples of matlab)
- 2013-05-07 22:48:21下载
- 积分:1
-
matlabb
数字语音处理及MATLAB仿真[张雪英][程序源代码](Digital audio processing and MATLAB simulation [ZhangXueYing] [source code])
- 2010-12-06 23:02:09下载
- 积分:1
-
n_r
用牛顿法计算简单电力系统潮流,可以计算任意节点的潮流。自动输出中间的相关结果,并且有清晰可以操作的界面(Newton s method with a simple power flow)
- 2011-12-13 14:22:39下载
- 积分:1
-
myfuzzywasher
模糊洗衣机系统,通过对衣服干净程度的判断来控制水温,洗衣时间长短以及洗衣粉用量。(Fuzzy washing system, through the clean clothes to determine the extent to control water temperature, the length of time as well as laundry detergent dosage.)
- 2007-08-16 08:25:19下载
- 积分:1
-
aidewo
说明: 我做的关于爱人的仿真程序, 关于爱人的仿真程序。(I love to do on the simulation program, the wife of the simulation program.)
- 2006-05-11 17:02:28下载
- 积分:1
-
dataaccess
说明: 使用文本文件(.txt)进行数据存取的技巧总结(Use a text file (. Txt) techniques for data access summary)
- 2010-03-26 13:01:59下载
- 积分:1
-
toolbox_sparsity
这是一个Matlab实现的图像Sparcy变换的程序,有助于了解多尺度变换。(This is a Matlab implementation of the image Sparcy transformation process, help to understand multi-scale transformation.)
- 2010-05-31 12:08:27下载
- 积分:1
-
3zuoye
某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
- 2015-04-17 18:59:46下载
- 积分:1