登录
首页 » matlab » cuboids_gravity

cuboids_gravity

于 2013-02-27 发布 文件大小:1KB
0 152
下载积分: 1 下载次数: 19

代码说明:

  This is a m file which can be used for calculating the gravity of cuboids.

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • zikong
    此资料是自动控制原理实验的具体步骤,能够帮助更好的使用matlab进行PID等控制实验(This information is the principle of automatic control experiment concrete steps can help make better use of matlab PID control experiment)
    2013-05-12 20:14:11下载
    积分:1
  • BP
    说明:  基追踪算法,用于解决压缩感知问题的经典算法,使用ADMM求解。(It is a matlab version of Basis Pursuit algorithm used to solving compressed sensing problem.)
    2018-03-13 16:04:04下载
    积分:1
  • boid
    Boid模型的matlab代码,仿真鸟类的情况,可生成动画。(The matla code of a boid model to simulate the bird flying ,which could be used to set up a*.avi animation.)
    2021-03-27 14:19:12下载
    积分:1
  • 1.4
    matlab数字图像处理,很实用的咯,关于图像的斑点检测(matlab digital image processing, it is useful cough, spots on the image detection)
    2014-02-24 21:55:35下载
    积分:1
  • wiener
    维纳滤波器,可以实现fir滤波和wiener滤波显示滤波结果(wiener filter)
    2010-07-27 15:09:21下载
    积分:1
  • Temperature_fuzzy_control
    temperature control by fuzzy controler simulation
    2010-12-31 11:57:25下载
    积分:1
  • matlab2
    说明:  matlab应用在辅助优化及计算当中和一些应用实例(matlab optimization and calculation used in supporting them, and some application examples)
    2010-04-15 13:03:54下载
    积分:1
  • T_C_M
    matlab simulink 实现TCM网格编码调制仿真。较好调试。(Matlab Simulink TCM Trellis Coded Modulation simulation. Better debugging.)
    2012-05-28 20:05:07下载
    积分:1
  • user-guide
    一个MATLAB阵列信号处理的工具箱介绍,大家看看吧(A MATLAB toolbox described array signal processing, we see it)
    2011-04-21 17:20:07下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 696516资源总数
  • 106554会员总数
  • 12今日下载