-
iriscode
iris recognition matlab application
- 2010-01-29 21:07:30下载
- 积分:1
-
Cleves_Corner_Compressed_Sensing
"Magic" Reconstruction: Compressed Sensing.
- 2013-03-23 09:07:05下载
- 积分:1
-
DWT_chain.m
It wil perform DWT on a given signal using Chain process
- 2011-12-30 14:27:20下载
- 积分:1
-
waterpouring
this is mimo waterpouring system.
- 2010-10-25 18:53:14下载
- 积分:1
-
me_ULA_Music
阵列天线中的子空间算法中经典的MUSIC算法程序,使用的是均匀线阵。(Neutron space antenna array classical algorithm MUSIC algorithm algorithm using a linear array)
- 2013-12-13 10:00:02下载
- 积分:1
-
sample-matrix-inversion
algo for making sample matrix inversion response pattern
- 2011-05-26 16:37:19下载
- 积分:1
-
CA6140
说明: 普通机床改造成数控机床,是学生毕业也是经常遇到的课题.(Transformed into ordinary CNC machine tools, graduate students are also frequently encountered issues.)
- 2011-02-22 00:02:02下载
- 积分:1
-
此仿真模型采用pmsg电机应用
建立风力发电机模型,此仿真模型采用pmsg电机应用,再根据PI控制器方法构造控制器,达到能控制发电机的转速、转角等等等(Build wind generator model, the simulation model using pmsg motor applications, according to PI controller method to construct the controller, to control the generator speed, angle, etc., before running this simulink model, it should also write the reference value code to run.)
- 2016-04-02 11:14:02下载
- 积分:1
-
moxingyuece3
高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
- 2014-01-10 17:30:42下载
- 积分:1
-
traces
this is a matlab file channel rate who is maked by me.this is used in gsm,gprs,edge traffic simulation.
- 2010-06-10 06:20:43下载
- 积分:1