登录
首页 » matlab » plotseismic

plotseismic

于 2021-04-12 发布 文件大小:1KB
0 230
下载积分: 1 下载次数: 32

代码说明:

  用MATLAB绘制地震数据记录的源代码,可帮助地球物理专业的学生利用MATLAB快速学会绘制地震记录。(plots seismic traces in matlab)

文件列表:

plotseismic.m,1236,2014-03-25

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • MATLAB-img_pro
    matlab图像处理工具,包含了很多常用和不常用的处理方法(matlab image processing tool, containing a number of commonly used and are not commonly used approach)
    2009-09-25 09:21:23下载
    积分:1
  • xianzai
    用matlab 实现功能界面 3种主功能(Matlab interface to achieve functionality with three kinds of features)
    2009-06-22 21:33:39下载
    积分:1
  • cavity1D
    This program in Matlab code, calculates resonance frequencies of a 1D cavity by using FDTD method
    2011-06-16 23:21:51下载
    积分:1
  • Canny
    Edge detector of Canny.
    2009-09-17 21:06:21下载
    积分:1
  • wavelet
    小波分析因其在处理非平稳信号中的独特优势而成为信号处理中的一个重要研究方向。如今随着小波理论体系的不断完善,小波以其时频局部化特性与多尺度特性在图像边缘检测领域中倍受青睐。(Wavelet analysis of nonstationary signal processing because of its unique advantage in signal processing and become an important research direction in. Now with the wavelet theory system ceaseless and perfect, the time-frequency localization characteristic of wavelet based and multi scale characteristics in the image edge detection is very popular.)
    2012-04-11 22:21:27下载
    积分:1
  • SuperMarioBrosDemo
    此文件在matlab中,打开,运行可以玩超级玛丽哦,只不过没有敌人,但不过也挺有意思的(This file in matlab, open, running can play Super Mario Oh, but there is no enemy, but also very interesting)
    2013-05-01 13:52:01下载
    积分:1
  • pipe
    某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定n 口油井的位置,即它们的x 坐标(东西向)和y 坐标(南北向),应如何确定主管道的最优位置, 即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置。(An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time to determine the optimal position in charge of Road.)
    2008-07-07 10:25:25下载
    积分:1
  • twoDomp
    基于L阵的二维信号稀疏分解的DOA估计 应用稀疏分解方法进行二维DOA估计(Estimation sparse decomposition method based on two-dimensional signal-dimensional DOA estimation of sparse matrix decomposition L DOA)
    2014-01-06 17:20:07下载
    积分:1
  • New-Microsoft-Word-Document
    it will nagative the i/p image
    2013-12-17 18:50:42下载
    积分:1
  • C3
    说明:   M-file for Project 1 on line parameters and circuit models in Chapter 3 m1.m determines the RLC parameters of the line from its physical description and then computes the ABCD matrix and the circuit parameters of the series RL, nominal pi and equivalent pi model of the line. It computes and plot the receiving-end real and reactive power circle diagram of the line assuming that the voltage magnitude at the sending- and receiving-end are kept constant.
    2010-03-03 17:19:23下载
    积分:1
  • 696516资源总数
  • 106840会员总数
  • 5今日下载