登录
首页 » Visual C++ » opencvcalibration

opencvcalibration

于 2014-10-27 发布 文件大小:3KB
0 205
下载积分: 1 下载次数: 2

代码说明:

  对摄像的标定进行模拟,来分析误差对结果的影响,来确定标定的对最后结果的影响。(To simulate camera calibration to analyze the impact of the error on the results to determine the impact on the final outcome of the calibration.)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • QtMatlab
    一个简单的Matlab与Qt结合的项目。(A simple combination of Matlab and Qt project.)
    2013-08-19 15:45:50下载
    积分:1
  • windowfilter
    主要是数字信号中窗函数的设计与分析,matlab源代码的设计,提供了时域与频域分析(Is mainly the design and analysis of window function in the digital signal, the design of Matlab source code, provides the analysis of time domain and frequency domain)
    2015-04-03 18:34:48下载
    积分:1
  • pmx
    Matlab遗传算法的部分映射交叉算子(pmx)源码。硕士论文论文参考(Matlab part mapping crossover operator of genetic algorithm (PMX) source )
    2014-09-06 15:16:07下载
    积分:1
  • VBdiaoyong(MATlab)
    详细介绍VB调用MATLAB的几种方法 里面有具体方案(details call VB MATLAB several methods with a specific program)
    2007-05-22 22:27:06下载
    积分:1
  • Applications-au-demarrage-de-Windows
    Applications au démarrage de Windows.xls
    2014-10-05 04:27:27下载
    积分:1
  • observe
    视频采集 matlab仿真 这个程序可以参考参考 个人觉得不错(Video capture)
    2012-05-11 08:21:16下载
    积分:1
  • CTP-example-in-CPP
    上海期货市场自动交易接口CTP开发示例代码。(CTP interface examples codes.)
    2015-02-07 16:47:57下载
    积分:1
  • 3class_svm_matlab
    说明:  使用libsvm进行三分类,svm多分类可以类似编程(Use libsvm for three categories, svm classification can be more similar to programming)
    2021-01-01 00:58:58下载
    积分:1
  • rtxdep
    RTX开发包,是RTX内部文件,对于做开发很有用.(rtx dep file)
    2010-01-07 23:08:39下载
    积分:1
  • 3zuoye
    某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
    2015-04-17 18:59:46下载
    积分:1
  • 696518资源总数
  • 105665会员总数
  • 6今日下载