登录
首页 » matlab » 16QAMyingshetu

16QAMyingshetu

于 2011-10-24 发布 文件大小:226KB
0 152
下载积分: 1 下载次数: 9

代码说明:

  16QAM的映射图的比较 里面有没有进行信道估计的映射图 和进行了信道估计的映射图(Comparison of 16QAM mapping there are no plans for channel estimation for a map and map channel estimation)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • sine
    正弦sin映射,要学习混沌的可以了解下,还有pdf曲线(Sine mapping with pdf curve, learning chaos can understand)
    2021-04-28 16:48:44下载
    积分:1
  • Matlab7toolboxuse
    这个程序是关于Matlab7中工具箱使用方法,新手和老手都会从中得益。(This procedure is Matlab7 in the toolbox on the use of novices and old hands will benefit from it.)
    2007-11-22 16:58:02下载
    积分:1
  • MATLABjiemi
    美国人写的matlab教材,非常好,简单易懂(Americans matlab written materials, very good, easy to understand)
    2009-12-18 19:11:17下载
    积分:1
  • An-Introduction-to-Programming-and-Numerical-Meth
    An Introduction to Programming and Numerical Methods in MATLAB - S.R. Otto & J.P. Denier
    2014-09-22 01:56:34下载
    积分:1
  • OFDM_crosscorrelation
    OFDM同步技术仿真,带有码间干扰和半码调制,多信道衰落。(OFDM synchronization technology simulation, inter-symbol interference and a half with code modulation, multichannel fading.)
    2013-11-30 00:38:21下载
    积分:1
  • leadlag
    Compensadores en adelanto y atraso
    2012-11-29 04:23:59下载
    积分:1
  • Savitzky-Golay-matlab
    SG平滑滤波matlab源码,在平滑去噪方面很有用(SG smoothing matlab source code, useful in smoothing denoising)
    2016-05-23 11:16:25下载
    积分:1
  • shuxuejianmo_3
    说明:  某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
    2009-07-24 22:58:49下载
    积分:1
  • PBGfor1D
    说明:  传输矩阵法计算一维光子晶体带隙图的程序,很好用(Transfer matrix method to calculate one-dimensional photonic band gap diagram of the process, a very good use)
    2009-08-25 08:43:49下载
    积分:1
  • firsubband_g
    this is the active noise developed by running an active sysetem
    2011-08-06 20:47:22下载
    积分:1
  • 696518资源总数
  • 105877会员总数
  • 14今日下载