登录
首页 » matlab » MATLAB

MATLAB

于 2011-10-30 发布 文件大小:21015KB
0 176
下载积分: 1 下载次数: 4

代码说明:

  MATLAB教程:有入门介绍,符号计算,数值计算,数组,可视化编程等等(MATLAB Tutorial: Getting Started with introduction, symbolic computation, numerical computation, arrays, visual programming, etc.)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • Photonic_crystal_resonant_cavities(TE-TM)
    Photonic crystal square resonant cavities TE-TM mode
    2009-01-02 23:44:37下载
    积分:1
  • lianxi
    在Matlab中,实现牛顿插值算法的源程序(In Matlab, the realization of Newton interpolation algorithm source)
    2008-06-24 21:32:39下载
    积分:1
  • dijkstra+Kruskal
    说明:  迪杰斯特拉和克鲁斯卡尔算法的Matlab实现。包含dijkstra.m和Kruskal.m文件,可用matlab直接打开,添加到运行路径后即可;或者用文本打开,复制代码。(Realization of Dijster Straw Algorithms in MATLAB)
    2020-06-16 07:00:01下载
    积分:1
  • Huffman-modeling
    信源编译码仿真,信道编译码仿真,数字调制解调仿(Simulation of the source codec, channel coding simulation, digital modulation and demodulation simulation)
    2013-09-22 19:45:28下载
    积分:1
  • Root-MUSIC-algorithm-source.
    MUSIC算法是基于天线阵列协方差矩阵的特征分解类DOA算法,这里给出的是求根MUSIC算法源程序。(MUSIC algorithm is based on the characteristics of the antenna array covariance matrix decomposition class DOA algorithm given here is Root MUSIC algorithm source.)
    2014-01-06 15:38:38下载
    积分:1
  • MIMO_OFDM
    mimo通信系统:mimo-ofdm通信系统仿真(mimo communication system)
    2011-12-18 11:26:33下载
    积分:1
  • trainingDWT
    using DWT and neural net
    2012-01-11 11:29:09下载
    积分:1
  • genzong00110
    一个目标跟踪的实例,用的是交互式多模型仿真方法。(Examples of tracking a target, using a method of interactive multi-model simulation.)
    2009-05-09 01:48:07下载
    积分:1
  • Lecture7_exc_2
    electric motor with torque speed control
    2012-03-23 02:53:03下载
    积分:1
  • JSP--E-T--GA
    针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
    2012-04-29 21:39:36下载
    积分:1
  • 696516资源总数
  • 106432会员总数
  • 11今日下载