登录
首页 » matlab » power_wind_dfig1

power_wind_dfig1

于 2013-09-17 发布 文件大小:66KB
0 189
下载积分: 1 下载次数: 20

代码说明:

  Simulink Wind Turbine Model

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • ECGSimulator
    The work simulates the ECG
    2010-06-19 13:38:09下载
    积分:1
  • caculation
    关于MATLAB与双馈风机接口计算智能算法(About MATLAB and DFIG computational intelligence algorithms Interface)
    2013-07-21 18:31:06下载
    积分:1
  • xianxingchazhi
    信号分析处理-线性插值实例。。。。。。。。。。(Signal- linear interpolation examples)
    2011-12-14 21:15:55下载
    积分:1
  • matport
    atport - Matlab接口模块 Matport是NTPort Library的MatLab接口模块。借助Matport,你可以在Matlab中直接访问PC的I/O端口。(atport- Matlab interface module Matport is NTPort Library of MatLab interface module. With Matport, you can directly access the PC in Matlab of the I/O port.)
    2009-01-04 21:01:12下载
    积分:1
  • robotics
    一些关于matlab仿真机器人的资料,包括4自由度机器人,六自由度机器人等(Information on robot learning, including the establishment of the coordinate system, the forward kinematics, inverse kinematics, location Jacques force Jacobian)
    2012-05-14 22:44:20下载
    积分:1
  • BOOST-CONVERTER-OPENLOOP
    This is matlab simulation model for Boost converter with open loop
    2014-09-03 14:47:05下载
    积分:1
  • G_P-method
    GP方法求解一维时间序列的关联维数,程序简单易懂,可以实现判断一维时间序列是否出现混沌。(GP correlation dimension method for solving one-dimensional time series, simple program to understand and can determine whether the one-dimensional time series appear chaotic.)
    2015-01-22 17:05:37下载
    积分:1
  • create_COE_file_from_vector
    Create COE for Xilinx FPGA
    2014-01-21 22:35:24下载
    积分:1
  • 3zuoye
    某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
    2015-04-17 18:59:46下载
    积分:1
  • 带有扰动信号,仿真结果理想PIDraodong
    PID仿真程序,且带有扰动信号,仿真结果理想,PID的抗扰动能力好(PID simulation program, and with the disturbance signal, the ideal simulation, PID good anti-disturbance)
    2020-07-07 19:48:56下载
    积分:1
  • 696518资源总数
  • 106010会员总数
  • 4今日下载