登录
首页 » WORD » load-data

load-data

于 2015-02-12 发布 文件大小:8KB
0 210
下载积分: 1 下载次数: 50

代码说明:

  欧洲智能技术网络(EUNITE)竞赛负荷预测样本数据Load1999(European Smart Technology Network (EUNITE) contest load forecasting sample data Load1999)

文件列表:

欧洲智能技术网络(EUNITE)竞赛负荷预测样本数据Load1999.xls,36352,2015-02-12

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • AudioSpectrum
    Webmaster will activate your member account after checking your files. If you do not want to upload source code, you
    2016-03-07 14:46:10下载
    积分:1
  • Anybus-NetTool-for-PROFIBUS
    Anybus NetTool for Profibus 1.9.1.4 (DEMO max 2 slaves for configuration download)
    2021-05-14 11:30:03下载
    积分:1
  • OA
    说明:  OA办公自动化市场宣传资料,欢迎同仁们下载了解(OA office automation marketing information, please download the understanding of colleagues)
    2011-02-26 23:45:09下载
    积分:1
  • bgxms
    说明:  办公小秘书 办公小秘书 (small office secretary Secretary of the Secretary of small office small office secretary)
    2006-04-08 21:21:37下载
    积分:1
  • GPS_SINS
    这个是GPS和SINS的组合导航系统的研究论文,对导航研究者有很大的参考意义.(This is a combination of GPS and SINS navigation system research papers, researchers have a lot of the navigation of the reference value.)
    2020-07-01 14:20:01下载
    积分:1
  • OA
    说明:  简单的oa系统 全源代码完整,初学者可学习及二次开发(Oa simple system-wide source code integrity, and beginners can learn and secondary development)
    2010-04-11 18:13:45下载
    积分:1
  • load-data
    欧洲智能技术网络(EUNITE)竞赛负荷预测样本数据Load1999(European Smart Technology Network (EUNITE) contest load forecasting sample data Load1999)
    2015-02-12 16:38:17下载
    积分:1
  • TheDesignof35kVGridRelayprotection
    本压缩包 包含 任务书、论文以及答辩ppt,虽说是课程设计,但是按照毕业设计书写,内容充实 本次课程设计主要是对象湖变的电网进行保护整定,对d1至d6共6个地方进行了最大方式与最小方式运行情况下的短路电流计算。计算完短路电流后,对L1至L5共5条线路进行电流保护整定。但是由于线路较短,线路阻抗较小。经计算后均不适合三段式电流保护。所以采取了纵联差动保护作为主保护,定时限过电流保护作为后备保护。对于变压器,采用纵联差动保护与气体保护共同作为主保护,过负荷保护作为后备保护。(The curriculum design is the object variable grid lake protection setting of D1 to D6, 6 places for the maximum and minimum operation mode under the condition of short-circuit current calculation. Calculation of short-circuit current after the end, L1 to L5 a total of 5 lines of current protection setting. But because of shorter lines, line impedance is small. The calculations are not suitable for three phase current protection. So take a longitudinal differential protection as the main protection, timing and limiting current protection as a back-up protection. For transformers, using longitudinal differential protection and gas protection as the main protection, overload protection as a back-up protection.)
    2012-03-06 16:26:36下载
    积分:1
  • campbell_fsi
    openfoam基于simple的 FSI 计算,由campell(2011)基于OpenFoam开发(FSI problem based on OpenFOAM simpleFoam solver by Campell(2011))
    2014-08-21 19:50:43下载
    积分:1
  • OA
    说明:  开源免费OA系统,附带数据库创建脚本,比较好安装(Open Source Free OA system, with database creation scripts, is better to install)
    2010-03-30 16:17:52下载
    积分:1
  • 696518资源总数
  • 106182会员总数
  • 24今日下载