登录
首页 » matlab » DWT-for-LL

DWT-for-LL

于 2015-02-17 发布 文件大小:137KB
0 214
下载积分: 1 下载次数: 1

代码说明:

  I have uploaded for DWT watermarking for LL band I have applied DWT on host image for first level and then for second level on LL band.

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • FBG
    计算均匀FBG反射谱,已通过调试,只要修改参数即可(refective spectrum for FBG )
    2012-02-03 20:58:57下载
    积分:1
  • PipedWriter
    Places information on a communications pipe. When two threads want to pass data back and forth, one creates a piped writer and the other creates a piped reader.
    2014-02-18 14:05:14下载
    积分:1
  • Tangential_force
    切削力随正切角的变化关系 可以看出切削力的变化情况(tangential angle and cutting force)
    2016-05-01 10:41:29下载
    积分:1
  • Assignment3DMC
    DYNAMIC MATRIC CONTROL FOR HEATER EXAMPLE IN CAMACHO
    2010-11-15 23:21:04下载
    积分:1
  • [计及需求响应的配电网短期负荷精细化预测]
    计及需求响应的配电网短期负荷精细化预测(Fine forecasting of short term load of distribution network considering demand response)
    2020-12-13 16:19:15下载
    积分:1
  • 81404593juxingchuang
    说明:  matlab 滤波器设计的源程序 福建的历史卡机弗兰克斯敬爱疯了撒 (matlab filter design of the source of Fujian)
    2008-11-10 14:27:27下载
    积分:1
  • CMAPSS Segmentation
    python code for cmapss segmentation
    2019-02-18 03:29:38下载
    积分:1
  • frfgsdnn988
    speed and position control of dc motor
    2014-12-10 00:29:43下载
    积分:1
  • OFDM-M
    Low complexity decoding for OFDM using M-algorithm. This is writting in Spain.
    2012-11-17 20:24:36下载
    积分:1
  • moxingyuece3
    高速铁路路基沉降是一个复杂的系统过程,涉及不同时期、不同工况,选用单一的预测模型不足以反映路基整体的变形规律.Logistic模型及Verhulst模型的曲线均为S形,可以反映全过程的地基沉降与时间的关系.针对路基填筑期和降水期两个时段利用MATLAB软件编制程序计算模型参数,得到Logistic模型和灰色Verhulst模型,进而求得两者的最优加权组合模型.对比结果表明:在路基填筑期由两者的最优加权组合模型预测得到的结果与实测结果较吻合,拟合精度高于单一模型 而在降水期Verhulst模型的预测值更接近实测值,平均相对误差约为1.75%,拟合精度较高.(High-speed railway subgrade settlement process is a complex system involving different times and in different conditions, the choice of a single forecasting model does not adequately reflect the overall deformation of roadbed. Curve Logistic model and Verhulst models are S-shaped, the whole process can be reflected foundation settlement versus time. against roadbed construction period of two hours and precipitation using MATLAB software programming model parameters, the Logistic model and gray Verhulst model, and then get the optimal model of a weighted combination of the two. comparative results indicate : results and experimental results in the roadbed construction period by the weighted combination of the best of both models predicted than the anastomosis fitting accuracy than a single model precipitation predicted value of Verhulst model closer to the actual value of the average relative error approximately 1.75 fitting accuracy.)
    2014-01-10 17:30:42下载
    积分:1
  • 696516资源总数
  • 106913会员总数
  • 8今日下载