-
emf
c和windows通信的结构描述,接口,实例源程序。very very good。(c and the windows of communication to describe the structure, interface, source code examples. very very good.)
- 2007-09-03 15:23:53下载
- 积分:1
-
PSO
粒子群优化算法的源程序代码 经验证是可行的(Personal collection of a directed acyclic graph support vector machine for multi-classification problems)
- 2011-06-09 22:23:33下载
- 积分:1
-
VMD程序
变分模态分解的matlab程序,便于分析(Variational modal decomposition of the matlab program, easy to analyze)
- 2017-10-11 10:40:14下载
- 积分:1
-
guiji
轨迹发生器,自动生成导航轨迹,可用于导航解算。(Trajectory generator, automatically generate the navigation path can be used in navigation solution.)
- 2010-11-03 15:22:21下载
- 积分:1
-
Chapter3
all of gonzalez image proccessing excercises with persian explanation
- 2012-03-30 21:50:54下载
- 积分:1
-
OQPSK_test
OQPSK code to run OQPSK in simulink
- 2014-01-27 19:18:54下载
- 积分:1
-
rcwa-1d
基于严格波耦合分析的matlab软件,可分析光栅的各种性能,特性(Rigorous Coupled Wave Analysis)
- 2021-03-30 21:09:09下载
- 积分:1
-
Gas-turbine-LM2500
gas turbine model manufacture by GE company
- 2020-12-19 17:29:09下载
- 积分:1
-
Matlab_Mfile_for_NMF
说明: 非负矩阵分解nmf,通过迭代w和h,收敛后输出最终w和h。(Non-negative matrix decomposition nmf, through iteration W and h, the final W and H are output after convergence.)
- 2019-03-07 21:58:25下载
- 积分:1
-
3zuoye
某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
- 2015-04-17 18:59:46下载
- 积分:1