-
PI_SNR
盲源分离的的简单易用 适合初学者你们慢慢学习下我只能帮你到这了(signal separation snr matlab code)
- 2014-10-28 16:03:57下载
- 积分:1
-
parameter-estimation-
Welch法谱估计和参数模型谱估计的MATLAB分析(Welch spectral estimation MATLAB analysis and parameter estimation of the model spectrum)
- 2013-12-25 18:50:31下载
- 积分:1
-
chenxu
求解一维偏微分方程,matlab语言。中心差分,先前差分(Solving one-dimensional partial differential equations)
- 2013-09-11 14:59:08下载
- 积分:1
-
XAudio
Tool for programing matlab 6.0
- 2012-11-21 01:42:57下载
- 积分:1
-
TestMatlab65
C++和matlab混编示例 (Mixed C++ and matlab examples)
- 2011-06-10 10:43:14下载
- 积分:1
-
LPF(FIR-Hamming)
采用Hamming窗实现的低通滤波器,可设置通带频率、截止频率以及带宽等滤波器特性参数。(The low-pass filter is realized by using Hamming window, can set the passband filter characteristic parameters such as frequency, the cut-off frequency and bandwidth.)
- 2014-10-23 20:34:22下载
- 积分:1
-
around
说明: 地球绕圆心的运动,对各位应该有启发地球绕圆心的运动(The Earth' s movement around the center of a circle, there should be instructive for you)
- 2010-03-20 09:13:17下载
- 积分:1
-
simulink
SIMULINK简明教程,希望对初学者有用(simulink tutorial, I hope useful for beginners)
- 2012-04-19 10:32:38下载
- 积分:1
-
rs
说明: RS码的C实现,通过mex接口,在MATLAB中创建的LTE下行链路中测试,可跑出误码率曲线。(RS code is implemented in C, by mex interface, LTE downlink created in MATLAB test can be run out of BER curves.)
- 2014-08-12 15:23:33下载
- 积分:1
-
3zuoye
某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
- 2015-04-17 18:59:46下载
- 积分:1