-
chebfun_v2_0501
The chebfun project is a collection of algorithms, and a software system in object-oriented Matlab, which extends familiar powerful methods of numerical computation involving numbers to continuous or piecewise-continuous functions. It also implements continuous analogues of linear algebra notions like the QR decomposition and the SVD. The mathematical basis of the system combines tools of Chebyshev expansions, fast Fourier transform, barycentric interpolation, Clenshaw-Curtis quadrature, and recursive zerofinding.
- 2009-06-24 21:24:07下载
- 积分:1
-
rechuandao-matlab
一篇关于matlab在热传导领域的应用文献。(A literature matlab in the field of thermal conduction.)
- 2013-02-01 18:15:39下载
- 积分:1
-
2011a_new
CUMCM 2011A 等高线CUMCM 2011A 等高线CUMCM 2011A 等高线CUMCM 2011A 等高线(CUMCM 2011A CUMCM 2011A CUMCM 2011A CUMCM 2011A CUMCM 2011A CUMCM 2011A CUMCM 2011A CUMCM 2011A )
- 2013-09-06 11:10:19下载
- 积分:1
-
ditect
一个简单的指纹识别matlab程序,包括预处理,特征点提取及指纹识别。(a simple matlab program about figerprint identification , including predispose, feature extraction,and fingerprint identification)
- 2016-04-24 16:51:22下载
- 积分:1
-
MOSPO
说明: 多目标粒子群算法,两个目标的粒子群算法,得到的图时帕累托前沿(Particle swarm optimization algorithm for two targets)
- 2019-12-01 15:42:05下载
- 积分:1
-
AGA
介绍一种改进传统遗传算法的新方法,通过调节交叉概率和变异概率(Introduction of a new genetic algorithm to improve the traditional method, by adjusting the crossover probability and mutation probability)
- 2010-05-17 16:22:20下载
- 积分:1
-
MVDR_MMSE
运用最小均方误差算法实现自适应波束形成的MATLAB源程序(Minimum mean square error algorithm using adaptive beamforming)
- 2011-06-27 15:28:01下载
- 积分:1
-
JSP--E-T--GA
针对带有交货期窗口硬约束,并对提前/拖期零件进行惩罚的一类作业车间调度问题,设计了一种改进型遗传算法EGA。交货期窗口硬约束是指每个零件均有交货期和deadline,零件可以在交货期后完工,但绝不能超出deadline。EGA采用“逆向后推”和“顺向前拉”相结合的两阶段求解策略。针对部分染色体在解码过程中违反交货期窗口硬约束而产生非法解的问题,采用基于关键路径的染色体修复方法来调整染色体基因序列,以期实现在满足交货期窗口硬约束的同时降低零件拖期成本;在保持第一调度阶段拖期成本不变的基础上,采用基于逆向重调度的目标值修订方法来延迟零件开工时间,以减小成品提前库存成本。(This paper deals with the job shop scheduling problem with due window to minimize the sum of weighted earliness and weighted tardiness of jobs. This due window is a time duration between the due date and the latest acceptable completion date, namely dealine, of a job. Penalties are incurred if jobs are completed within the due window and the illegal schedule will occur if one job is finished after its deadline. A new Enhanced Genetic Algorithm (EGA), based on a two phase schedule mechanism was introduced. To avoid the violations of due window constraint and simultaneously reduce tardiness costs, a chromosome repair method based on critical paths was designed to adjust chromogene sequence. Then, on keeping tardiness costs unchanged, an objective value revision method based on reverse rescheduling was put forward to delay job release date for reducing earliness costs introduced by each job. )
- 2012-04-29 21:39:36下载
- 积分:1
-
lab6
masking of an image with diffrent size
- 2011-08-18 19:36:30下载
- 积分:1
-
human-testing
主要利用粒子滤波进行人体跟踪,能很好地进行人体跟踪(The main use of the particle filter for human body tracking, can be used for human body tracking)
- 2013-10-12 13:38:37下载
- 积分:1