-
DSCN2325
MATLAB 对各种信道模式下不同调制模式的仿真实例仿真分析(MATLAB model of the various channels of different modulation simulation analysis of the simulation examples)
- 2010-01-12 22:09:22下载
- 积分:1
-
CPPapi
C++标准库,C++ Standard Library,是类库和函数的集合,其使用核心语言写成,由c++标准委员会制定,并不断维护更新。(The C++ standard library, C++ Standard Library, is a set of class libraries and function, the use of the core language, developed by the c++ Standards Committee, and continue to maintain and update.)
- 2015-01-17 09:23:49下载
- 积分:1
-
Applications-au-demarrage-de-Windows
Applications au démarrage de Windows.xls
- 2014-10-05 04:27:27下载
- 积分:1
-
BackscatterMap
雷达影像后向散射系数计算,并绘制后向散射系数图(backscattering coefficients of Radar image, show the figure of backscatter coefficients)
- 2021-03-31 15:49:09下载
- 积分:1
-
clustering
将Weka数据挖掘工具所产生的K-MEANS和DBSCAN结果转化成MATLAB可输出三维图像的格式(Weka data mining tools will be generated by K-MEANS and DBSCAN results can be exported into MATLAB three-dimensional image format)
- 2008-06-05 10:09:27下载
- 积分:1
-
HuffmanMap
Visual C++ Huffman Map Implementation
- 2014-09-29 09:31:04下载
- 积分:1
-
Chapter1
数据测试,数据分析,数据还原,数据载入。(Data testing, data analysis, data reduction, data load.)
- 2014-11-29 15:13:20下载
- 积分:1
-
1
说明: vb调用MATLAB的程序说明,非常好用(vb call the MATLAB program that is very easy to use)
- 2011-02-11 11:45:37下载
- 积分:1
-
0291512780
混沌序列发生器,一种随机序列的预测!时间序列的分析和预测!(Chaotic sequence generator, a random sequence of the forecast! Time series analysis and forecasting!)
- 2007-12-03 16:29:03下载
- 积分:1
-
3zuoye
某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
- 2015-04-17 18:59:46下载
- 积分:1