-
小电流接地系统故障
说明: 对于电力系统网络,当其发生小电流接地故障时,分析其特性(For power system network, its characteristics are analyzed when a small current grounding fault occurs)
- 2019-11-18 20:27:11下载
- 积分:1
-
Loggingdataprocessing
自己编的测井数据处理软件,用于处理测井数据,有例子(Own series of logging data processing software for processing log data, there are examples)
- 2010-09-14 16:10:32下载
- 积分:1
-
PV-Battery Model V4.5.5
说明: 光储一体化机程序,适用于PSCAD4.5.5以上版本(This file outlines a Photovoltaic (PV) and battery system in PSCAD. A general description of the entire system and the functionality of each module are given to explain how the system works and what parameters can be controlled by the system.)
- 2020-06-10 09:56:44下载
- 积分:1
-
PartialDischarge
局部放电指数衰减信号产生程序,加噪声程序以及除噪声程序(Exponential decay of partial discharge signal generation program, plus noise process and procedures, inter-noise)
- 2009-11-25 17:17:42下载
- 积分:1
-
Glauert
基于Glauert设计法进行计算叶片的风轮直径以及弦长,安装角等数据计算(The calculation of blade diameter, chord length and installation angle based on Glauert design method)
- 2020-06-29 15:00:01下载
- 积分:1
-
power system scheme
说明: 用遗传算法求解电网规划问题,双层算法求解,上层为遗传算法,下层利用拉格朗日对偶线性化后求解(Genetic algorithm is used to solve the power grid planning problem, double-layer algorithm is used to solve the problem, the upper layer is genetic algorithm, and the lower layer is solved by Lagrange dual linearization)
- 2020-10-27 11:19:58下载
- 积分:1
-
02 Economic Dispatching using Nested PSO
基于粒子群算法(Nested PSO)的电力系统经济调度,matlab平台。(solve power system economic dispatch problem by Nested PSO algorithm)
- 2020-06-30 05:20:02下载
- 积分:1
-
按能量最大的观点自适应提取系统各测点特征频带下的暂态零模电流 GlineMalfunction
按能量最大的观点自适应提取系统各测点特征频带下的暂态零模电流,并利用暂态零模电流相关性实现故障选线(According to the viewpoint of maximum energy, the transient zero mode current under the characteristic frequency band of each point in the system is extracted, and the fault line selection is realized by using the transient zero mode current correlation)
- 2020-07-13 16:28:58下载
- 积分:1
-
liuguanfa
油田开发效果评价,考虑非均质性的流管法!输入相渗曲线、高压物性资料、渗透率伽马分布等,即可进行油田水驱开发效果评价!(Oilfield development effect assessment, consider the heterogeneity of the flow tube! Input relative permeability curves, PVT data, the penetration of the gamma distribution, oil field water flooding effect evaluation can be carried out!)
- 2012-08-10 22:35:35下载
- 积分:1
-
modeling2D1
过程法数字岩心建模,构建二维数字岩心,自己编写改进的(Process-based Digital Core Modeling)
- 2019-03-07 19:24:48下载
- 积分:1