登录
首页 » HTML » book

book

于 2019-04-24 发布 文件大小:207KB
0 143
下载积分: 1 下载次数: 1

代码说明:

  asp+excel农村农家书屋图书在线检索系统 v201904(ASP + excel online retrieval system for rural bookstores v201904)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • BEMD
    Nunes 制作的二维经验模型分解程序,matlab2000年以前版本可以使用,之后版本有bug需要改进(Nunes produced two-dimensional empirical model decomposition program, matlab 2000 years ago, the use of the future, after the version of the need to improve the bug)
    2017-07-18 18:56:06下载
    积分:1
  • Labwindows/CVI 十六路开关信号
    Labwindows/CVI 十六路开关信号(Labwindows/CVI sixteen-way switch signal)
    2013-06-04 08:54:03下载
    积分:1
  • webtest
    http+json api 调试工具,方便在调试接口(http+json api debug tool)
    2020-06-24 16:00:01下载
    积分:1
  • ARM课程设计题目及参考资料
    基于arm2410的多任务与AD转换 采用基于UCOS的多任务编程方法,通过电位器输入3个模拟量,通过AD转换采集电压值,每个任务监视一路AD转换,每一路AD的转换结果在液晶屏上用一个水平柱状图来表示,柱状图的长度代表电位器输入电压的大小,直观地显示每路模拟输入电压的大小。(Multi-Task and AD Conversion Based on Arm2410)
    2019-01-14 14:22:47下载
    积分:1
  • sphygmomanometer_MSP430
    基于MSO430系列单片机的电子血压计设计源程序,有注释。(Source, design based on MSO430 series single-chip electronic sphygmomanometer comment.)
    2012-06-20 11:19:39下载
    积分:1
  • sim1204pfy
    matlab实现全息成像!!!!!!!!!!(Holographic imaging based on MATLAB)
    2019-05-09 22:32:29下载
    积分:1
  • STC15f104W脉冲
    STC15F104W单片机,定时器使用,15分钟时间,测试完全有效(STC15F104W MCU, timer use, 15 minutes time, the test is completely effective)
    2018-03-09 11:21:55下载
    积分:1
  • 基于供电网格优化划分的中压配电网规划思路和方法
    提出了一套基于供电网格优化划分的中压配电网规划思路和方法。首先,确定规划区域主干通道布局,确保土地资源预留。然后,在明确网格划分目的和原则的基础上,基于就近选择负荷备供变电站和负荷聚类方法,实现供电网格在全局范围内的优化划分。最后,分别在各供电网格内,基于其供区分类优选接线模式和一、二次建设改造标准,并进行主干线布线规划。(This paper presents a set of ideas and methods for medium voltage distribution network planning based on power grid optimization. Firstly, the layout of the main corridors in the planning area is determined to ensure the reservation of land resources. Then, on the basis of defining the purpose and principle of grid partition, the optimal partition of power supply grid in the global scope is realized based on the near selection of load standby substation and load clustering method. Finally, in each power supply grid, based on the classification of supply areas, the optimal wiring mode and reconstruction standards of primary and secondary construction are selected, and the main wiring planning is carried out.)
    2020-06-19 06:40:01下载
    积分:1
  • jizukongzhi
    一篇关于机组控制的文章,1.5MW双馈式变速恒频风电机组控制系统研究(An article on the control unit, 1.5MW-style double-fed VSCF wind turbine control system)
    2009-01-14 17:09:51下载
    积分:1
  • 张勇的linQ学习P2P及IM软件的极佳素材代码
    张勇的linQ学习P2P及IM软件的极佳素材代码-Zhang Yong, the peer-to-peer learning and IM excellent source material
    2022-03-20 22:38:00下载
    积分:1
  • 696518资源总数
  • 105877会员总数
  • 14今日下载