-
Nyquist
Stability criteria Nyquist plot in Matlab.
- 2014-02-07 07:37:33下载
- 积分:1
-
分数阶算法编程
分数阶算法编程(fopid)
- 2018-03-10 14:44:54下载
- 积分:1
-
Basesss2
FCM code source help you to execute an automatic seglentation using c++ language
- 2014-08-30 07:02:29下载
- 积分:1
-
medical-cbir1234
MEDICAL CRBI for health
- 2015-03-02 02:13:11下载
- 积分:1
-
new-adaptive-kalman
分别使用传统卡尔曼滤波和改进的自适应卡尔曼滤波对运动物体进行跟踪,比较并分析结果,验证自适应卡尔玛滤波的优点。(Respectively using conventional Kalman filter and adaptive Kalman filter for improved tracking of moving objects, compare and analyze the results to verify the advantages of adaptive filtering Kalmar.)
- 2020-09-09 10:08:02下载
- 积分:1
-
imagemerge
本段代码主要是为了实现讲多光谱图像进行光谱分离然后再合并成一种可以在matlab中显示的格式.tif的图像,同时保证了原始的图像信息不丢失(This code is mainly to achieve multispectral images speak for spectral separation and then combined into a format that can be displayed in matlab. Tif image, while maintaining the original image information is not lost)
- 2014-02-21 20:26:19下载
- 积分:1
-
areanav
interactive area plot
- 2006-10-15 10:57:09下载
- 积分:1
-
puguji2007
谱估计 (1)修正协方差法 (2)多重信号分类(MUSIC)算法 (3)ESPRIT算法 (4)皮萨论科(Pisarenko)谐波分解法 并对各算法进行分析。 解压后即可在MATLAB上运行(Spectral estimation (1) modified covariance method (2) multiple signal classification (MUSIC) algorithm (3) ESPRIT algorithm (4) pizza on the Branch (Pisarenko) harmonic decomposition method and algorithm analysis. After decompression can be run in MATLAB)
- 2012-06-04 17:43:57下载
- 积分:1
-
IIR
用巴特沃斯逼近以及双线性实现数字滤波器的设计~~!!(iir)
- 2009-11-21 11:19:00下载
- 积分:1
-
shuikuidiaodupso
说明: 水电站中长期优化调度主要是在满足电力系统出力要求以及下游综合用水要求等的前提下,合理地安排水库各个月份的发电流量,使得调度期内的总发电量最大。即在给定预报入库流量过程线、下游综合用水流量过程线、调度期起始水位和终止水位等条件下,通过总水量的合理运用使调度期内水电站的总发电量最大。(Long-term optimal operation of hydropower stations mainly in the power system to meet the output requirements, and integrated water requirements downstream of the premise, reasonable arrangements for generating reservoir flow each month, making the scheduling period, the largest amount of total power generation. That is forecast in a given inflow hydrograph, downstream water discharge hydrograph synthesis, scheduling and termination of the initial water level and water level conditions, the total amount of water through the rational use of the scheduling period, the total generating capacity of the largest hydropower station.)
- 2011-03-07 09:40:57下载
- 积分:1