登录
首页 » WINDOWS » Vector_Control

Vector_Control

于 2018-01-04 发布 文件大小:43KB
0 289
下载积分: 1 下载次数: 24

代码说明:

  通过matlab中的simulink对基于svpwm的三相异步电机矢量控制系统进行仿真。(The vector control system of three-phase asynchronous motor based on SVPWM is simulated by Simulink in MATLAB.)

文件列表:

Vector_Control.mdl, 371332 , 2017-11-14

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • PVgridconnected
    This simulation presents a PI algorithm control strategy for PV system connected to a three-phase voltage source inverter of a distributed generation system in the stand-alone operation mode to guarantee good performance of the load output voltage
    2017-02-28 00:58:06下载
    积分:1
  • 双向
    说明:  dcdc仿真电路的PSCAD仿真C语言嵌入式开发(Embedded development of PSCAD simulation C language for dcdcdc simulation circuit)
    2018-12-21 23:05:58下载
    积分:1
  • Statcom
    STATCOM一些论文,大约50篇.大部分中文的.网上下的.大家觉得有需要就下载看看.(STATCOM number of papers, about 50. Most of the Chinese. Online under. We find it necessary to download to see.)
    2010-09-08 14:11:16下载
    积分:1
  • PQ control
    微电网中微电源PQ控制,即恒功率控制方式(Micropower PQ control.)
    2020-12-27 16:39:02下载
    积分:1
  • 微网并网仿真
    matlab搭建的微网并网仿真模型,希望有用(Matlab built microgrid simulation model, I hope useful)
    2017-11-15 14:58:49下载
    积分:1
  • turbine
    mathematical model of wind Turbine
    2018-11-02 03:07:10下载
    积分:1
  • UDF-fluent
    本程序应用于fluent数值模拟蒸发相变过程,由于fluent软件内不含所需的蒸发模型的方程,需要加入用户自定义(UDF编程)计算,改程序即为蒸发相变模拟编程。(This procedure is applied to the evaporation phase transition fluent numerical simulation process, since the evaporation model equations contain the desired fluent software necessary to add user-defined (UDF programming) is calculated, that is, change procedures evaporated analog programming a phase change.)
    2017-03-29 10:22:40下载
    积分:1
  • SVPWM
    可借鉴用于基于Simplorer的多场耦合永磁同步电机SVPWM整理仿真。(It can be used for SVPWM finishing simulation of multi-field coupled permanent magnet synchronous motor based on Simpler.)
    2019-04-11 09:29:23下载
    积分:1
  • 9MW变速变桨距控制的DFIG
    这是一个变速变桨距控制的9MW风力发电并网系统(DFIG),先运行.m文件,设定Ts=5e-6s。亲测有效(This is a variable speed pitch control 9MW wind power generation grid connected system (DFIG). First, run the.M file and set Ts=5e-6s. Pro test effectiveness)
    2018-07-24 13:19:24下载
    积分:1
  • XianLuZiDongChongHeZa
    说明:  线路自动重合闸,三相和单项短路后,又重新恢复正常。(After three-phase and single short circuit, the line will return to normal again.)
    2021-01-14 16:49:02下载
    积分:1
  • 696518资源总数
  • 105877会员总数
  • 14今日下载