c8s1_power_hvdc12pulse
仿真模型中,通过1000MW(5OOkv, 2kA)的直流输电线路从一个500KV、5000mva、50hz的电力系统EM向另一个345kv10000mva50hz的电力系统Ell输送电力。整流桥和逆变桥均由两个通用6脉冲桥搭建而成。交流滤波器直接接在交流母线上,它包括11次、13次和更高次谐波等单调支路。总共提供600mvar的容量。(In the simulation model, the 1000MW (5OOkv, 2kA) DC transmission line transfers power from one 500KV, 5000MVA, 50Hz power system EM to another 345kv10000mva50hz power system Ell. The rectifier bridge and the invert bridge are all constructed by two general 6 pulse bridges. The AC filter is connected directly to the AC bus, which includes 11 or 13 and higher harmonics. A total capacity of 600mvar is provided.)
- 2017-07-16 14:34:46下载
- 积分:1
-
1118-daidiaoyong
用TDMA方法制作的程序,一般用于求解难度较大的换热器问题。(Program produced with the TDMA method, generally used for solving the difficult problem of the heat exchanger.)
- 2020-06-29 12:40:02下载
- 积分:1
-
wlsStateEstimation
运用加权最小二乘法进行电力系统状态估计 具有较好的收敛性 但适合于较小的系统(Using weighted least squares state estimation of power system has a good convergence, but for smaller systems)
- 2010-09-01 16:22:29下载
- 积分:1
-
DFIGformular
说明: 是一个完整的1.5MW双馈风机简化模型,输入是风速,输出是功率,还没有做到并网模块(It is a complete simplified model of 1.5MW doubly fed fan. The input is wind speed and the output is power. The grid connection module has not been achieved)
- 2020-04-24 17:04:41下载
- 积分:1
-
于群 MATLAB_Simulink电力系统建模与仿真
适合学习SIMULINK继电保护方面的进行学习(Suitable for learning SIMULINK relay protection)
- 2018-12-07 15:33:54下载
- 积分:1
-
IEEE_39bus_PI_Pooya_mask
30 Wind Power Penetration (DFIG-based Wind Farm)in IEEE 39 Bus Power System/MATLAB
- 2014-12-15 21:07:55下载
- 积分:1
-
SPP-Imbalance-Market-
报告首先介绍了2011年西南电力库(SPP)的市场业务,包括推动电能不平衡市场的发展,引入优先使用廉价电力机制,监控每个市场参与者的电源/负荷平衡和提高系统可靠性。报告随后介绍了2014年西南电力库的集中市场情况,该集中市场将包括多天的可靠性机组启停过程、包含辅助服务在内的日内市场清算服务以及和辅助服务共同优化的实时平衡过程。随后分析了集中市场和其他市场的区别,以及集中市场的功能。(The report first describes the 2011 Southwest Power Pool (SPP) of the market business, including the promotion of energy imbalance market, the introduction of priority in the use of cheap electric power system, monitoring of each market participant the power/load balancing and improve system reliability. The report then describes the Southwest Power Pool 2014, the concentration of market conditions, the concentration of the market will include a number of days the reliability of the unit commitment process, including support services, including day services and the market clearing and support services to optimize the balance between real-time process. Subsequent analysis of the concentration difference between the market and other markets, and focus on the function of the market.)
- 2011-05-16 11:14:00下载
- 积分:1
-
load-prediction
根据历史数据,利用反馈神经网络对电力系统运行负荷进行预测(power prediction)
- 2012-02-17 15:50:55下载
- 积分:1
-
半动态法节点优化
说明: 可实现ieee30节点编号的优化,以及利用稀疏技术存储(It can optimize IEEE 30 node number and store it with sparse technology)
- 2020-12-07 12:59:20下载
- 积分:1
-
YongciContronerCAN_V2.0.X-master
说明: 永磁同步电机控制器程序,主控芯片为dspic30F6012A(Program of permanent magnet controller, the main control chip is dspic30F6012A)
- 2020-01-15 11:53:03下载
- 积分:1