-
on how this is a voice of discrete signal processing, with specific examples and...
这个是关于如何将一个语音信号进行离散的处理,有具体实例和SAMPLE-on how this is a voice of discrete signal processing, with specific examples and SAMPLE
- 2023-03-19 00:10:04下载
- 积分:1
-
测算超效率SBM模型的matlab代码SBM_DEA 1
说明: 测算超效率SBM模型的matlab代码,可以加入非期望产出(Matlab code for calculating super efficiency SBM model)
- 2021-04-16 10:48:53下载
- 积分:1
-
GIS+VB开发. GIS+VB开发.
GIS+VB开发. GIS+VB开发.-GIS+ VB development. GIS+ VB development.
- 2022-03-13 08:37:09下载
- 积分:1
-
TURBO CODES
说明: codes of turbo codes
- 2019-05-02 18:52:57下载
- 积分:1
-
hashin_puck_VUMAT
ABAQUS复合材料损伤起始与扩展的子程序,拉伸采用hashin, 压缩采用PUCK.适用于显示分析(ABAQUS Composite Damage Initiation and Extension Subprogram, Hashin for Tensile and PUCK for Compression. Suitable for Display Analysis)
- 2019-06-13 18:59:44下载
- 积分:1
-
SOLARPV
说明: EXAMPLE OF PSSE simulations and python scripting (solar PV)
- 2019-10-15 21:27:01下载
- 积分:1
-
物品出租管理系统 VB+数据库
天鹰商品出租信息管理系统,基于VB代码开发实现,注:打开时需要输入的密码为:1,不需要输入确认密码。操作说明:在网格第一格上按回车键,接着在输入框中输入要出租、归还的商品编号,输入完毕后按回车键,此时将自动显示该商品的信息。
- 2022-04-10 14:32:55下载
- 积分:1
-
snake2
这是三维贪吃蛇小游戏,在一个空间曲面上爬行,比较难操作(This is a 3D Snake game that crawls on a spatial surface and it is difficult to control.)
- 2020-06-21 10:20:02下载
- 积分:1
-
十六进制转换为十进制,是想应用程序可视化界面实现不同进制之间的转换。...
十六进制转换为十进制,是想应用程序可视化界面实现不同进制之间的转换。-sixteen to ten
- 2022-04-15 00:09:48下载
- 积分:1
-
Distribution network planning
说明: 提出了一套基于供电网格优化划分的中压配电网规划思路和方法。首先,确定规划区域主干通道布局,确保土地资源预留。然后,在明确网格划分目的和原则的基础上,基于就近选择负荷备供变电站和负荷聚类方法,实现供电网格在全局范围内的优化划分。最后,分别在各供电网格内,基于其供区分类优选接线模式和一、二次建设改造标准,并进行主干线布线规划。(This paper presents a set of ideas and methods for medium voltage distribution network planning based on power grid optimization. Firstly, the layout of the main corridors in the planning area is determined to ensure the reservation of land resources. Then, on the basis of defining the purpose and principle of grid partition, the optimal partition of power supply grid in the global scope is realized based on the near selection of load standby substation and load clustering method. Finally, in each power supply grid, based on the classification of supply areas, the optimal wiring mode and reconstruction standards of primary and secondary construction are selected, and the main wiring planning is carried out.)
- 2020-06-19 06:40:01下载
- 积分:1