登录
首页 » matlab » PVarray_detailedmodel_100kW_1

PVarray_detailedmodel_100kW_1

于 2021-04-18 发布
0 308
下载积分: 1 下载次数: 15

代码说明:

说明:  100kW光伏电源接入25kV配电网,官方例子,在simulink可运行(100kW photovoltaic power supply is connected to 25kV distribution network)

文件列表:

PVarray_detailedmodel_100kW_1.slx, 64077 , 2019-07-16

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • 系统稳定与控制 P.kundur
    说明:  本书是美国电力研究院(EPRI)组织“电力系统工程丛书”中,一部专门阐述电力稳定与控制的专著。随着世界范围内电力系统互联逐步扩大、新技术的不断采用、经济性以及电力工业调整所带来的约束,现代电力系统正日趋复杂。因这部专著的帮助,读者可以有效地解决由于电力工业的巨大变化所带来的稳定与控制方面的问题。(This book is a monograph on power stability and control in "Power System Engineering Series" organized by EPRI. With the gradual expansion of power system interconnection in the world, the continuous adoption of new technologies, economy and the constraints brought by the adjustment of power industry, modern power system is becoming increasingly complex. With the help of this monograph, readers can effectively solve the problems of stability and control brought about by the great changes in the power industry.)
    2020-12-30 10:12:36下载
    积分:1
  • 网粒子群优化算法
    说明:  微网粒子群优化配置程序,风光储设备选型及容量配置(Microgrid particle swarm optimization configuration program)
    2021-04-21 10:48:49下载
    积分:1
  • power_turbine
    说明:  本例程通过matlab提供的simulink水轮机程序,做了改动,调整了部分参数,并且增加了借阅,模仿水轮发电机组一次调频过程,值得借鉴(Through the Simulink turbine program provided by matlab, the routine has been changed, some parameters have been adjusted, and borrowing has been added to imitate the primary frequency regulation process of the hydro-generator set. It is worth learning from.)
    2020-09-09 22:28:07下载
    积分:1
  • SPP-Imbalance-Market-
    报告首先介绍了2011年西南电力库(SPP)的市场业务,包括推动电能不平衡市场的发展,引入优先使用廉价电力机制,监控每个市场参与者的电源/负荷平衡和提高系统可靠性。报告随后介绍了2014年西南电力库的集中市场情况,该集中市场将包括多天的可靠性机组启停过程、包含辅助服务在内的日内市场清算服务以及和辅助服务共同优化的实时平衡过程。随后分析了集中市场和其他市场的区别,以及集中市场的功能。(The report first describes the 2011 Southwest Power Pool (SPP) of the market business, including the promotion of energy imbalance market, the introduction of priority in the use of cheap electric power system, monitoring of each market participant the power/load balancing and improve system reliability. The report then describes the Southwest Power Pool 2014, the concentration of market conditions, the concentration of the market will include a number of days the reliability of the unit commitment process, including support services, including day services and the market clearing and support services to optimize the balance between real-time process. Subsequent analysis of the concentration difference between the market and other markets, and focus on the function of the market.)
    2011-05-16 11:14:00下载
    积分:1
  • IEEE 34 Node Test Feede
    说明:  34 bus distrubution test case in PSCAD
    2021-01-30 10:14:59下载
    积分:1
  • hermite
    适合计算方法初学者使用的埃尔米特插值程序 改变函数节点和值 即可(hermite interpolation)
    2017-04-30 15:33:57下载
    积分:1
  • BUCK
    说明:  BCUK电路双环PID仿真,实现了电压环和电流环,突然加载测试(Bcuk circuit double loop PID simulation realizes voltage loop and current loop, sudden load test)
    2020-07-06 21:58:58下载
    积分:1
  • 双馈风机模型-翻译完毕
    双馈风电模型,英文资料已经翻译为中文,根据模型可搭建成功的风机模组,用于模拟仿真。(Double - fed wind power model, the English information has been translated into Chinese, and the model can build a successful wind module for simulation simulation)
    2017-11-15 20:02:55下载
    积分:1
  • WindFarm
    基于PSCAD的风电厂建模,包含不同子模块,可模拟风电厂的实际运行(The wind power plant model based on PSCAD includes different sub-modules, which can simulate the actual operation of the wind power plant.)
    2019-03-30 10:31:11下载
    积分:1
  • power-flow
    电力系统潮流程序,适合初学者.含读取数据文件,形成节点导纳矩阵,形成雅可比矩阵等所有计算过程的程序。(power flow )
    2013-07-16 11:13:22下载
    积分:1
  • 696516资源总数
  • 106562会员总数
  • 4今日下载