登录
首页 » Matlab » CS的OMP算法

CS的OMP算法

于 2022-04-22 发布 文件大小:1.57 MB
0 77
下载积分: 2 下载次数: 1

代码说明:

压缩感知的贪婪算法OMP,包括原代码,测试代码,还有信号恢复成功率与测量数、信号稀疏性的关系图示

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • conjugated-MUSIC
    共轭MUSIC与平滑MUSIC,来实现波达方向估计(The conjugated MUSIC smoothing MUSIC DOA estimation)
    2013-05-06 21:21:26下载
    积分:1
  • selection_diversity
    说明:  接收端选择性多样化,用于优化瑞丽信道的衰落,减少误码率(selection diversity)
    2011-03-16 22:19:41下载
    积分:1
  • CurveLab-2.1
    curvelab transform is one of type mathematical algorithem using in image processing
    2011-03-19 21:12:09下载
    积分:1
  • shiyan3
    控制系统的超前滞后校正,以及在MATLAB中的实现。需要的人可以看一下。(System Calibration。Lead and lag correction control system in MATLAB. Those who need it can look.)
    2012-04-10 19:44:48下载
    积分:1
  • homework-of-matlab-GUI
    matlab GUI 下简单的图书管理系统的小程序,包含有软件设计概要及用户手册,适合初学者入门。(matlab GUI for beginner)
    2020-06-29 22:00:01下载
    积分:1
  • antenna
    Antenna show, how is working
    2011-12-02 23:31:37下载
    积分:1
  • MPC的轨迹跟踪
    描述无人驾驶无人驾驶车辆模型预测控制  这个书搭配的示例代码,笔者改过,加了不同的路径。
    2020-05-10下载
    积分:1
  • DVBS2_HMatrix
    Source code to Generate DVB-S2 paritycheck matrix .
    2013-01-12 18:08:12下载
    积分:1
  • QSItools
    QSI is Quantitative Seismic Interpretation for seismic modeling
    2013-09-01 00:38:40下载
    积分:1
  • shuxuejianmo_3
    说明:  某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
    2009-07-24 22:58:49下载
    积分:1
  • 696516资源总数
  • 106475会员总数
  • 7今日下载