-
PrimeNumber
判断一个数是否为素数。可以作为分析研究素数编程的人参考。(To determine whether a number is prime. Analysis of prime numbers can be used as programming easy reference)
- 2009-11-26 11:46:23下载
- 积分:1
-
nvms
控制对人员的增删改查的控制以及Session或着Cook 的应用调和个一些验证
(Control personnel additions and deletions to change the control and check the Cook' s application of Session, or to reconcile a number of validation)
- 2009-11-28 09:01:33下载
- 积分:1
-
AjustePSSpotencia
Adjust parameters for a Power PSS algorithm for synchronous gerator control
- 2015-03-10 21:55:47下载
- 积分:1
-
ga_inverted-pendulum
Matlab code for GA alogrithm, inverted pendulum
- 2013-12-18 12:37:59下载
- 积分:1
-
(EEMD)Prony
MATLAB实现基于EEMD和prony信号分解的故障测距模型。也可配合EMD文件。
内有备注(MATLAB realization of fault location model EMD and prony signal decomposition. But also with EMD file.
There are Notes)
- 2016-01-25 16:24:10下载
- 积分:1
-
PV_buck_boost_mppt
此仿真是风力发电直流侧斩波控制simulink仿真(This simulation is the wind power dc side chopper control simulink simulation)
- 2019-03-12 21:14:09下载
- 积分:1
-
correlated-waveforms
MIMO 雷达波束设计的经典文献,大家可以参考(Effects on beam pattern performance for colocated
multi-input multi-output radar transmitting correlated
waveforms)
- 2014-12-04 21:55:07下载
- 积分:1
-
Image-Segmentatin-and-Thresholding-Method
This Source Code for Image Segmentation and applying the threshold at image
- 2013-11-03 16:05:10下载
- 积分:1
-
shuxuejianmo_3
说明: 某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
- 2009-07-24 22:58:49下载
- 积分:1
-
book2_codes76543
matlab code for satelite simullation
- 2011-05-22 18:30:35下载
- 积分:1