登录
首页 » matlab » 117143168performance_of_MIMO

117143168performance_of_MIMO

于 2010-05-18 发布 文件大小:11KB
0 194
下载积分: 1 下载次数: 18

代码说明:

  在瑞利信道下MIMo系统性能的仿真的编程实例(In Fading Channel MIMo system performance simulation programming examples)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • MAC_layer
    OFDM is using for wireless technology.This source cede used to investigate mac layer of OFDM
    2009-03-31 20:40:05下载
    积分:1
  • CP0201_2PPM_TH
    TH-PPM(跳时脉冲位置调制)调制的超宽带脉冲形成的源代码(TH-PPM (TH pulse position modulation) modulation of the formation of ultra-wideband pulse source code)
    2006-11-21 15:20:25下载
    积分:1
  • hw1-1
    Read a file into a matrix and display it on the screen using the MATLAB commands imagesc and axis.
    2014-09-11 15:00:27下载
    积分:1
  • DFT
    C++实现数字信号处理中的DFT算法,不是快速算法,是基础DFT算法(C++ implementation of digital signal processing DFT algorithm, not a fast algorithm is the basis of DFT algorithm)
    2014-10-25 20:08:01下载
    积分:1
  • Sesia--S.---LTE--The-UMTS-Long-Term-Evolution
    Sesia, S. - LTE, The UMTS Long Term Evolution
    2013-12-14 08:38:28下载
    积分:1
  • SCA
    说明:  一种新的优化算法,正余弦优化算法。提出了一种新的基于种群的优化算法,叫做正弦余弦算法(SCA).(A new optimization algorithm, sine cosine optimization algorithm. A new optimization algorithm based on population is proposed, which is called sine cosine algorithm)
    2021-02-17 10:04:07下载
    积分:1
  • MATLAB-Fundamentals-and-Applications
    北航经典书籍随书程序MATLAB基础与应用(Northern Classic Books program with the book and applications based on MATLAB)
    2011-06-15 11:02:41下载
    积分:1
  • Modeling-and-Simulation-of-AC-Motor
    在 Matlab/Simulink 中,建立独立的功能模块,如电机本体模块、矢量控制模块、速度控制模块、电流滞环控制模块等,再进行功能模块的有机整合,搭建交流异步电机控制系统的仿真模型。(In M atlab/Simulink, the independent function al blocks, such as Moter modelblock,Vector control block, Speed controller block, and Hysteresis current controllerblock etc,have been modeled. By the organic combination of these blocks, the model of control system canbe establishedeasily. )
    2014-09-20 10:13:21下载
    积分:1
  • fuhefenpei-matlab
    发电公司一般不允许改变当天的电价投标,但可以改变机组的可用性.因此,在获得发电量之后如何组织机组进行发电,同时,又要保证成本低、效益高、收益大,是每个发电公司需要解决的问题,而行之有效的方法就是动态规划。(Power companies generally are not allowed to change the electricity price bidding, but can change the usability of the unit. Therefore, how to organize the unit after obtaining her capacity to generate power, at the same time, and to ensure that the low cost, high efficiency, large gains, is each generation company needs to solve the problem, and the effective method of dynamic planning.)
    2016-05-18 11:13:13下载
    积分:1
  • dspautoscale
    Simulink Design For Sound AutoScaling and Curve Fitting
    2013-01-30 13:42:20下载
    积分:1
  • 696518资源总数
  • 105877会员总数
  • 14今日下载