登录
首页 » matlab » minisum-maximum-otsu

minisum-maximum-otsu

于 2012-05-12 发布 文件大小:1KB
0 169
下载积分: 1 下载次数: 82

代码说明:

  实现最小交叉熵 最大熵 OTSU算法的小程序 简单实用(Minimum cross entropy maximum entropy OTSU algorithm procedure is simple and practical)

下载说明:请别用迅雷下载,失败请重下,重下不扣分!

发表评论

0 个回复

  • montecarlo
    这是montecarlo仿真程序,是用MATLAB编写的,也很容易理解,对理解montecarlo很重要!(This is a montecarlo simulation program is written with MATLAB, it is easy to understand, is very important for understanding montecarlo!)
    2010-11-05 23:09:47下载
    积分:1
  • simulatedannealing
    说明:  用MATLAB编制的模拟退火程序,程序后附注解释,以帮助理解(Compiled with MATLAB simulated annealing procedure)
    2010-04-15 15:54:17下载
    积分:1
  • jsscx2
    近似熵MATLAB的计算程序2,可以通过此程序对脑电信号EEG进行分析,达到你要的结果。程序仅供参考,里面可能有少许不足之处,希望大家不吝赐教。(approximate entropy MATLAB program two, through this procedure right EEG EEG analysis to achieve the results you want. Procedures for reference purposes only, which may have some shortcomings, we hope that substantive progress has spared no.)
    2007-05-11 10:07:49下载
    积分:1
  • matlab-import-dxf
    用matlab读取.dxf文件。本站原有代码dxf2coord_20.m中对于圆弧只能读出其圆心坐标及半径,缺少圆弧起始角及终止角,并不能在应用中实际用起来。修改后可以读出圆弧的起始角和终止角(the script can offer start angle and end angle of an arc,which are unable to access in an earlier script dxf2coord_20.m 。)
    2020-06-30 07:00:02下载
    积分:1
  • MNTCRLO
    This file is a solution for vertical seismic profile by mont carlo algoritm
    2012-01-13 02:27:39下载
    积分:1
  • PID_tuning_cruise_cntrol
    PID tuning cruise control
    2015-03-31 15:40:59下载
    积分:1
  • P_and_S_waves
    纵波横波地震波动方程,形象的描述了纵波横波传播方向与质点振动方向之间的关系(seismic wave functions)
    2015-04-20 22:27:27下载
    积分:1
  • Levinson
    AR模型参数确定后计算出功率谱, 用Levision_Durbin 算法(AR model parameters were calculated to determine the power spectrum, using Levision_Durbin algorithm)
    2007-09-06 22:11:22下载
    积分:1
  • shuikuidiaodupso
    说明:  水电站中长期优化调度主要是在满足电力系统出力要求以及下游综合用水要求等的前提下,合理地安排水库各个月份的发电流量,使得调度期内的总发电量最大。即在给定预报入库流量过程线、下游综合用水流量过程线、调度期起始水位和终止水位等条件下,通过总水量的合理运用使调度期内水电站的总发电量最大。(Long-term optimal operation of hydropower stations mainly in the power system to meet the output requirements, and integrated water requirements downstream of the premise, reasonable arrangements for generating reservoir flow each month, making the scheduling period, the largest amount of total power generation. That is forecast in a given inflow hydrograph, downstream water discharge hydrograph synthesis, scheduling and termination of the initial water level and water level conditions, the total amount of water through the rational use of the scheduling period, the total generating capacity of the largest hydropower station.)
    2011-03-07 09:40:57下载
    积分:1
  • SCE-UA
    对于目标优化,是一种种群算法,类似于遗传算法(The objective function of optimization algorithm )
    2012-05-01 02:36:17下载
    积分:1
  • 696518资源总数
  • 105877会员总数
  • 14今日下载