-
dddqqq
有关机动目标跟踪,卡尔曼滤波相关的资料,对从事卡尔曼滤波研究,机动目标跟踪的朋友有参考价值 (The maneuvering target tracking, Kalman filtering relevant information, engaged in Kalman filtering, target tracking friends have reference value)
- 2010-09-08 13:40:46下载
- 积分:1
-
SIMULACIONES
MULTIAGENTS 4 AGENTS, FORMATION PROBLEM
- 2013-08-25 14:42:29下载
- 积分:1
-
5-source-codes
The codes are the matlab platform.
they are begin simple to complex.
- 2015-01-10 15:39:27下载
- 积分:1
-
basic_ofdm_inter
basic ofdm with interlever:
The
transmitter section converts digital data to be transmitted, into a mapping of
subcarrier amplitude and phase. It then transforms this spectral representation of
the data into the time domain using an Inverse Discrete Fourier Transform
(IDFT).
The Inverse Fast Fourier Transform (IFFT) performs the same operations as an
IDFT, except that it is much more computational efficiency, and there is used in
all practical systems. In order to transmit the OFDM signal the calculated time
domain signal is then mixed up to the required frequency.
- 2013-05-02 01:39:22下载
- 积分:1
-
yuanma
金融数量分析:基于MATLAB编程第二版一书中自带源码,分享给大家(Financial quantitative analysis _ all source-based MATLAB programming second edition)
- 2013-11-24 22:57:11下载
- 积分:1
-
vsb
VSB信号仿真,做这个的很少.对VSB信号进行仿真,有调制和解调并加噪声过信道。(signal vsb by matlab,few people did this ever.)
- 2020-11-19 16:39:37下载
- 积分:1
-
symaphore
matlab program of a symaphore used to organise a serie of tasks
- 2013-05-13 01:12:39下载
- 积分:1
-
calcDError
Sensoer code is realted to loacalization that is written in matlab programming..
- 2009-07-09 01:33:25下载
- 积分:1
-
final-table
bootstrap method for calculate realibility of one shot system and simulation for accuracy it
- 2013-01-03 18:27:08下载
- 积分:1
-
3zuoye
某市有一码头,每次仅容一辆船停泊装卸货,由于经常有船等候进港,部分人提出要扩建码头。经过调查历史资料发现,码头平均每月停船24艘,每艘船的停泊时间为24±20小时,相邻两艘船的到达时间间隔为30±15小时,如果一艘船因有船在港而等候1小时,其消耗成本为1000元。经预算,扩建码头大约需要1350万元,故市长决策如下:如果未来五年内停泊船只因等候的成本消耗总和超过扩建码头花费则扩建码头,否则,不予扩建。因此,希望你能够帮助市长做出决策。此问题已知到达的大概时间和大概停泊时间,对于此问题用概率统计的方法来做比较复杂,可用程序随机产生到达时间和停泊时间来模拟未来五年内船的停泊,多次模拟预测停泊情况,以做出决策(。-Problem in a city with a terminal expansion dock, each only allow a boat moored loading and unloading, as often there are waiting boat into port, some people proposed to expand pier. Terminal stopping 24 per month, per vessel berthing time of 24 ± 20 hours, the arrival of two adjacent vessels interval 30 ± 15 hours, if a ship due to boat in the harbor while waiting for one hour, and its consumption cost of 1,000 yuan. The budget of about 13.5 million yuan expansion dock, so the mayor decision as follows: If a ship is moored next five years, the cost of waiting more than the sum of consumption spending is expanding marina pier extension, otherwise, not expanded.)
- 2015-04-17 18:59:46下载
- 积分:1