-
LCC_HVDC_chushimoxing
说明: 关于matlab里的传统直流输电系统的建模与仿真,交流-直流-交流。整流逆变装置(About the modeling and simulation of traditional DC transmission system in matlab, AC-DC-AC. Rectifier inverter)
- 2021-03-11 18:59:26下载
- 积分:1
-
JAVA
java画面同步,客户端上操控一个小球移动,同时服务端上显示一个小球随客户端移动(java,When the screen is synchronized, a small ball moves on the client side,,and a small ball is displayed on the server with the client moving)
- 2018-02-22 12:24:06下载
- 积分:1
-
ArticleSpiders
用Scrapy开发的爬取纽约时报新闻爬虫程序(Click New York Times News Program)
- 2020-06-24 14:40:02下载
- 积分:1
-
CEEMDAN 去噪
说明: 改进的CEEMD去噪方法,可以直接使用。效果惊人(The improved ceemd denoising method can be used directly. Amazing effect)
- 2021-03-09 19:39:27下载
- 积分:1
-
Java如何在多个EJB之间相互调用的例子
Java如何在多个EJB之间相互调用的例子,也就是各种EJB之间的调用例子,向初学者演示如何实现调用的具体代码及步骤,涉及以下相关方法:用远程接口的引用访问EJB、函数将被FirstEJB调用,同时它将调用secondEJB。。
- 2022-08-10 18:52:00下载
- 积分:1
-
pfsp timer onfigs
Wa Glafikal intalfase foor rooboots
- 2018-12-06 15:38:35下载
- 积分:1
-
57578883zuixiaoercheng
说明: matlab 计算电力系统潮流的最小二乘法(Matlab calculation of power system turbulence least squares)
- 2019-04-13 09:02:09下载
- 积分:1
-
Linux-install
如题:5种格式图书阅读器(PDF阅读器+TXT图书(Such as the title: 5 Book reader format (PDF+ TXT book reader)
- 2011-05-02 20:20:25下载
- 积分:1
-
speechenhancementcode
文件中包含关于语音增强的算法,其中有谱减法、子空间投影等多个算法编码(The file contains algorithms for speech enhancement, including spectral subtraction, subspace projection and other algorithms.)
- 2020-06-23 06:00:02下载
- 积分:1
-
基于供电网格优化划分的中压配电网规划思路和方法
提出了一套基于供电网格优化划分的中压配电网规划思路和方法。首先,确定规划区域主干通道布局,确保土地资源预留。然后,在明确网格划分目的和原则的基础上,基于就近选择负荷备供变电站和负荷聚类方法,实现供电网格在全局范围内的优化划分。最后,分别在各供电网格内,基于其供区分类优选接线模式和一、二次建设改造标准,并进行主干线布线规划。(This paper presents a set of ideas and methods for medium voltage distribution network planning based on power grid optimization. Firstly, the layout of the main corridors in the planning area is determined to ensure the reservation of land resources. Then, on the basis of defining the purpose and principle of grid partition, the optimal partition of power supply grid in the global scope is realized based on the near selection of load standby substation and load clustering method. Finally, in each power supply grid, based on the classification of supply areas, the optimal wiring mode and reconstruction standards of primary and secondary construction are selected, and the main wiring planning is carried out.)
- 2020-06-19 06:40:01下载
- 积分:1