-
LED摇摇棒的详细制作资料
LED摇摇棒的详细制作资料-mmm
- 2022-05-28 22:55:49下载
- 积分:1
-
很好的讲解java的ppt,很详细,不错
很好的讲解java的ppt,很详细,不错-good java on the ppt, in great detail, yes
- 2022-08-23 19:37:38下载
- 积分:1
-
Visual C++ 6.0 21天自学教程
Visual C++ 6.0 21天自学教程-Visual C 6.0 21-day self-study guide
- 2022-01-26 04:44:36下载
- 积分:1
-
主要讲述ARM的软硬件开发,以及关于PDA的系统设计,和Linux程序设计...
主要讲述ARM的软硬件开发,以及关于PDA的系统设计,和Linux程序设计-ARM focuses on software and hardware development, as well as on the PDA-system design, and Linux Programming
- 2022-01-31 15:15:45下载
- 积分:1
-
数据通讯与网络教程是进行网络编程和数据通信人员的一本圣经,共分为十部分,这是第八部分,尤其对准备从事网络编程、数据通信编程的工程人员具有指导意义。...
数据通讯与网络教程是进行网络编程和数据通信人员的一本圣经,共分为十部分,这是第八部分,尤其对准备从事网络编程、数据通信编程的工程人员具有指导意义。-data communication and network Guide is network programming and data communications staff of a Bible, is divided into 10 parts, This is the eighth part, in particular the right to engage in network programming, data communications programming staff is instructive.
- 2023-04-03 19:10:04下载
- 积分:1
-
vc技术内幕的源码, vc技术内幕的源码
vc技术内幕的源码, vc技术内幕的源码-vc technology insider source, vc technology insider source
- 2023-09-05 11:45:06下载
- 积分:1
-
讲述VC++与MATLAB接口编程的精通部分,对应于上一篇文章 ,学者要对应上一篇文章学习...
讲述VC++与MATLAB接口编程的精通部分,对应于上一篇文章 ,学者要对应上一篇文章学习-On the VC++ and MATLAB programming interface of the master part, corresponding to an article on, and scholars to study corresponds to an article on
- 2022-02-26 00:12:37下载
- 积分:1
-
驱动开发经验亮点。
驱动开发经验集锦。-driver development experience highlights.
- 2022-04-13 01:50:53下载
- 积分:1
-
一家石油公司计划在主管道中建设一个东向西。PIP…
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有 n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定 n口油井的位置,即它们的 x 坐标(东西向)和 y 坐标(南北向),应如何确定主管道的最优位置,即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置,使得给定n口油井的位置,编程计算各油井到主管道之间的输油管道最小长度总和。
-An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time in charge of Road to determine the optimal location, making a given n the location of oil wells, programmed to calculate the well-to-charge of Road between the length of the sum of the smallest oil pipeline.
- 2022-10-27 02:45:03下载
- 积分:1
-
The Scientist and Engineer s Guide to Digital Signal Processing book
The Scientist and Engineer s Guide to Digital Signal Processing book
- 2022-03-06 14:11:21下载
- 积分:1