-
经典IE编程教材――IE programming 5 ,里面详细讲述了DHTML的各种特性,以及在VC下如何进行利用IE相关接口进行编程。...
经典IE编程教材――IE programming 5 ,里面详细讲述了DHTML的各种特性,以及在VC下如何进行利用IE相关接口进行编程。-IE Programming classic materials- IE programming 5, which describes in detail the various characteristics of DHTML, as well as how the use of VC-related IE programming interface.
- 2022-12-05 20:50:03下载
- 积分:1
-
C语言大全第4版+源码
这是一个值得C语言学习者都去深入学习的一本书,里面有详细的代码注释.适合所有用写编写程序
的设计人员.
- 2022-08-19 04:37:49下载
- 积分:1
-
Sun Code Conventions for the Java Programming Language
sun 公司官方代码规范标准,java入门必备-Sun Code Conventions for the Java Programming Language
- 2022-03-10 07:05:36下载
- 积分:1
-
一篇LDPC编码的论文,具有很好的参考价值
一篇LDPC编码的论文,具有很好的参考价值-A thiese about ldpc code, It has a good value.
- 2022-01-25 18:36:18下载
- 积分:1
-
电子邮件的发送,是利用VC编的,还有很多不太完善的地方,请自己改一下...
电子邮件的发送,是利用VC编的,还有很多不太完善的地方,请自己改一下-E-mail sent, is the use of VC compiled, there are many places where less than perfect, please change your look
- 2022-04-20 20:33:07下载
- 积分:1
-
一个比较好得讲座
一个比较好得讲座-a relatively good to talk
- 2022-06-20 18:19:39下载
- 积分:1
-
C++中string的详解
C++中string的详解-C++ In string of Detailed
- 2023-05-11 21:40:02下载
- 积分:1
-
fuzzy moving sliding mode
fuzzy moving sliding mode
- 2022-08-22 05:34:09下载
- 积分:1
-
bootstrap loader Interface原理图
bootstrap loader Interface原理图-bootstrap loader Interface Schematic
- 2022-02-11 13:15:11下载
- 积分:1
-
一家石油公司计划在主管道中建设一个东向西。PIP…
某石油公司计划建造一条由东向西的主输油管道。该管道要穿过一个有 n 口油井的油田。从每口油井都要有一条输油管道沿最短路经(或南或北)与主管道相连。如果给定 n口油井的位置,即它们的 x 坐标(东西向)和 y 坐标(南北向),应如何确定主管道的最优位置,即使各油井到主管道之间的输油管道长度总和最小的位置?证明可在线性时间内确定主管道的最优位置,使得给定n口油井的位置,编程计算各油井到主管道之间的输油管道最小长度总和。
-An oil company plans to construct a east to west from the main pipeline. The pipeline to pass through an oil field n wells. Wells from each must have a pipeline along the shortest path (or South or North) connected with the competent Road. If given the location of oil wells in n, that is, their x coordinates (east-west) and y coordinates (north-south), should be how to determine the optimal position in charge of Road, even if the wells to the pipeline in charge of Road between the sum of the smallest length location? proved to be linear time in charge of Road to determine the optimal location, making a given n the location of oil wells, programmed to calculate the well-to-charge of Road between the length of the sum of the smallest oil pipeline.
- 2022-10-27 02:45:03下载
- 积分:1