-
SVM_tools
说明: matlab 工具箱,非常好用,对于有这方面需求的朋友,不错的选择。(matlab toolbox, very easy to use, has in this regard for the needs of friends, good choice.)
- 2008-08-29 10:24:20下载
- 积分:1
-
SINS_DV
matlab编写的轨迹发生器用于制造原始数据(matlab write the trajectory generator used in the manufacture of the raw data)
- 2012-09-20 12:15:11下载
- 积分:1
-
2010-matlab-5
2010 数学建模大赛 赛前matlab培训5(2010 Mathematical Contest in Modeling Training (numerical entry) lecture 5.zip)
- 2013-11-11 23:26:31下载
- 积分:1
-
Probabilistic-Neural-Network-
Probabilistic Neural Network
- 2014-02-20 10:45:11下载
- 积分:1
-
demodulation_and_equalization
对数输入据进行解调,并且对接收信号进行时间以及频率同步(Demodulation, time and frequency synchronisation)
- 2010-09-01 21:37:09下载
- 积分:1
-
dae2
用matlab作的,代数微分方程组的解法。(Matlab for use, and the solution of algebraic differential equations.)
- 2008-01-03 13:33:10下载
- 积分:1
-
Matlab---Smith-chart
微波技术电子史密斯圆图程序Matlab---Smith-chart(Matlab---Smith-chart)
- 2010-09-07 21:51:32下载
- 积分:1
-
ModalANALZ
modal analysis for two machine Kundor System
- 2012-10-10 22:04:35下载
- 积分:1
-
gn
说明: Market Newman写的复杂网络的加权GN算法 算法用Python写的
其基本思想是不断的删除网络中具有相对于所有源节点的最大的边介数(ege betweenness)的边,然后,再重新计算网络中剩余的边的相对于所有源节点的边介数(The basic idea is to delete the network with respect to all of the source nodes of the largest betweenness (EGE betweenness) edges, then re computing network the remaining edge relative to the boundary of the source node number of all)
- 2016-09-18 08:40:49下载
- 积分:1
-
shuxuejianmo_3
说明: 某厂向用户提供发动机,合同规定,第一、二、三季度末分别交货40台、60台、80台.每季度的生产费用为 (元),其中x是该季生产的台数.若交货后有剩余,可用于下季度交货,但需支付存储费,每台每季度c元.已知工厂每季度最大生产能力为100台,第一季度开始时无存货,设a=50、b=0.2、c=4,问工厂应如何安排生产计划,才能既满足合同又使总费用最低.讨论a、b、c变化对计划的影响,并作出合理的解释(To provide users with a factory engine, contract, first, second and third quarter respectively, delivered at the end of 40, 60, 80. Quarterly cost of production (million), in which x is the quarter of the number of production. If the remaining after delivery, can be used for delivery next quarter, subject to payment of storage fees, for each element c of each quarter. The largest known plant production capacity of each quarter to 100, the beginning of the first quarter of stock, set up a = 50, b = 0.2, c = 4, asked how to arrange the production of the factory plans to meet the total cost of the contract makes the minimum . Discussion of a, b, c of the impact of change on the plan and make a reasonable explanation)
- 2009-07-24 22:58:49下载
- 积分:1